Skip to form

Georgetown Township

contact@georgetown-mi.gov

1515 Baldwin St, PO Box 769, Jenison, MI, 49429-0769, US

616-457-2340

SeamlessDocs

We are No Longer Requiring a Water/Sewer Permit to be Filed for New Construction!


Water/sewer connection fees can be paid at the same time at the zoning fee when you drop off your building permit. Click here to go to our updated New Homes Building Permit.

2025 fees are the following:
  • Zoning Fee for a New Home: $200
  • Water/Sewer Connection in a Plat
    • For a home in Georgetown Township: $5,196
    • For a home in Blendon Township: $7,840
    • There may be an additional $50 fee for a storm sewer lateral if one is required for your property.
  • Water/Sewer Connection Not in a Plat
    • Please email Joel, Director of Public Works, to get a quote for unplatted/metes and bounds parcels: jhanenburg@georgetown-mi.gov
    • Or email our Contact Email: contact@georgetown-mi.gov
Please check that you agree before continuing.
By continuing I agree that I am willing to complete a digital version of the document(s) and that information about my user session will be stored.

Create Your Signature

Please fill in your name and email and then either draw or type your signature below.

x

Signature Type

Type Draw Upload Custom
Clear Signature

Signature will be applied to the page. You will have a chance to review after signing.

Check this box to continue

x

Additional Signatures Required