Skip to form

Georgetown Township

contact@georgetown-mi.gov

1515 Baldwin St, PO Box 769, Jenison, MI, 49429-0769, US

616-457-2340

SeamlessDocs

We are No Longer Requiring a Water/Sewer Permit to be Filed for New Construction!


Water/sewer connection fees can be paid at the same time at the zoning fee when you drop off your building permit. Click here to go to our updated New Homes Building Permit. If you're mailing a check to us separate from a building permit, please make sure to note the address/parcel number of the property you are paying for.

As of June 2025 fees are the following:
  • Georgetown Zoning Fee for a New Home: $200
  • Water/Sewer Connection in a Platted Development
    • For a single-family home in Georgetown Township: $5,196.00
    • For a duplex in Georgetown Township: $9,486.00
    • There may be an additional $50 fee for a storm sewer lateral if one is required for your property.
  • Water/Sewer Connection Not in a Plat (metes and bounds) or Blendon Township Parcels
    • PLEASE INCLUDE THE ADDRESS AND/OR PARCEL IN YOUR INQUIRY
    • Please email Joel, Director of Public Works: jhanenburg@georgetown-mi.gov
    • Or email our Contact Email: contact@georgetown-mi.gov

Please check that you agree before continuing.
By continuing I agree that I am willing to complete a digital version of the document(s) and that information about my user session will be stored.

Create Your Signature

Please fill in your name and email and then either draw or type your signature below.

x

Signature Type

Type Draw Upload Custom
Clear Signature

Signature will be applied to the page. You will have a chance to review after signing.

Check this box to continue

x

Additional Signatures Required